Some projects call for steel bending capabilities on an exceptional scale, and the new bridge protection scheme at Brighton Road near Coulsdon South was certainly one of them.
Angle Ring worked with Four-Tees Engineers to provide specialist steel forming, welding and cambering services for the major rail infrastructure project, which has seen new collision protection beams installed either side of the bridge carrying the Brighton Main Line over the A237 Brighton Road.
The bridge had previously been struck on multiple occasions by large vehicles, causing damage to the structure and disruption to rail services. The new protection system has been designed to absorb vehicle impacts before they reach the railway bridge itself, helping to protect the infrastructure and reduce the risk of future disruption.
For Angle Ring, the project involved working with steel sections of an exceptional size, including the largest angle sections the company has produced to date.
Pressing Angle Ring’s capabilities
A key element of Angle Ring’s contribution involved four 250 x 250 x 18mm equal angle sections in S355J2 steel, with individual lengths of up to 12 metres.
Due to the requirements of the project, these substantial sections were pressed rather than rolled to achieve the specified camber.
The scale of the angles made the work particularly notable for the Angle Ring team, with the 250 x 250 x 18mm sections representing the largest angles the company has produced.
Alongside the angles, Angle Ring was also commissioned to work on the substantial tubular steelwork forming part of the bridge protection system.
More than 26 metres of tubular steel
The tubular elements presented a different set of challenges.
With a diameter of 744mm and a wall thickness of 26.8mm, shorter tube sections had to be joined to create the lengths required for the finished structure.
For one assembly, two sections of approximately 12.3 metres were welded together to create a tube approximately 24.6 metres long before cambering. A second assembly combined two sections of approximately 12.3 metres with an additional 1.7 metre section, producing an assembly of approximately 26.3 metres.
The two tubes required different profiles, including 36mm of camber over a specified length of 21,522mm and 74mm of camber over 25,176mm.
Producing components on this scale required careful planning throughout the welding and cambering process, as well as consideration of how the exceptionally long finished sections would be handled and transported. Transport arrangements were developed around lengths of approximately 26 metres.
Welding, testing and quality control
Angle Ring’s involvement extended beyond forming the steel.
The tubular sections required welding prior to cambering, with the project incorporating a detailed testing and quality control process.
The longitudinal weld seams in the original tube material were ultrasonically tested before the steel arrived at Angle Ring. Angle Ring’s own production process incorporated welding, non-destructive testing before forming, cambering and further NDT following the bending process.
The work was carried out to the project’s Execution Class 3 requirements, providing the traceability and quality assurance required for structural steelwork destined for a major rail infrastructure scheme.
Detailed bend drawings were also prepared and agreed before production, allowing the required cambers to be established and checked ahead of manufacture.
Working to a demanding programme
Programme requirements added another dimension to the project.
During production, Angle Ring worked closely with Four-Tees Engineers as the wider project programme developed, including responding to a request to accelerate the welding and cambering works.
With the size of the components, testing requirements and specialist processes involved, coordination between the project teams was essential throughout production.
Angle Ring completed its work on the components in 2025, before the bridge protection beams progressed through the subsequent stages of fabrication and installation.
The collision protection beams were eventually installed at Brighton Road in summer 2026, forming part of what Four-Tees Engineers has described as probably the largest rail bridge protection beam installation in the UK.
The completed scheme now provides an additional line of defence for the Brighton Main Line bridge, helping to protect the structure from over-height vehicle strikes and improve the reliability of this important rail route.
For Angle Ring, the project is another example of how specialist steel bending, pressing, welding and fabrication expertise can be brought together to deliver complex components for major UK infrastructure.
Project facts
Project: Brighton Road rail bridge protection scheme
Location: Brighton Road, A237, near Coulsdon South station
Sector: Rail infrastructure / Civils
Angle Ring customer: Four-Tees Engineers
Asset: Brighton Main Line bridge
Angle Ring involvement: 2025
Installation: 2026
Angle Ring scope of work
Equal angles
- 250 x 250 x 18mm equal angle
- S355J2 steel
- Sections up to 12 metres long
- Pressed to specified cambers
- Largest angle sections produced by Angle Ring to date
Tubular steelwork
- 744mm outside diameter
- 26.8mm wall thickness
- Long tube assemblies created through welding
- Assemblies extending to approximately 26.3 metres prior to final processing
- Specialist cambering to project requirements
Additional services
- Welding
- Cambering
- Bend drawings
- NDT and quality control
- Execution Class 3 requirements